青青国产视频-国产精品电影网-91最新在线-伊人狠狠操-热精品-99热91-av一级大片-国内自拍偷拍网-一级特级黄色片-日韩欧美理论片-国产偷国产偷av亚洲清高

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site

主站蜘蛛池模板: 方正县| 突泉县| 土默特右旗| 南召县| 霸州市| 伊春市| 琼结县| 梨树县| 礼泉县| 湖南省| 宿松县| 贡山| 玛纳斯县| 桃园县| 龙陵县| 隆子县| 定襄县| 攀枝花市| 伊宁县| 五台县| 土默特左旗| 沂水县| 满洲里市| 榆林市| 军事| 西华县| 岳西县| 双桥区| 阳城县| 松滋市| 惠安县| 瓮安县| 白玉县| 黄陵县| 海兴县| 台州市| 驻马店市| 梧州市| 岗巴县| 怀化市| 东乌珠穆沁旗|